In the midst of everything with the construction of the new hall and all, we still do shipping. At times the absence of a floor or a hard surface have created smaller problems for us, but we have endured and managed to work around the obstacles. But those days are over now and the other day we shipped out two machines. Two double-machines of our popular SF4-2 series.