BIG Shipping Day!

 

One of our biggest shipping so far – 13,3 meters long, 3,6 meters high and 3,3 meters wide. One machine in three different 40 ft shipping containers – so to be sure we hired professionals to help us ease out the BIG machine in manageable pieces. The machine is our biggest acid-filler in the SF4-series; SF4-8 Ten. A VRLA-filler with 10 filling stations that actually is able to handle and fill up to ten different battery-types simultaneously. And of course it’s automatic change-over of the fixed filling heads…

 

First a little piece to warm us up.

Time for the bigger pieces… special tools for a heavy lift was necessary.

Preparations before lift was meticulous.

Then it was time to start moving the heavy stuff… very carefully.

Half of the bottom portion of the machine is on the roll. With the right type of equipment everything is easy easier.

Theoretically it should fit through the big door…

…and it did fit out the big door, even if it was tight! :)

Then comes the interesting part – lifting it up and into the 40 ft shipping container.

With a little assistance from our sturdy 3,5 ton fork lift we eased it into the shipping container. There was at least a centimeter (1/2 inch) on both sides.

Mission accomplished. Only the rest to load into the next two containers!

 

Packing day

This week we are busy packing here at Källström for a huge shipping come Monday.

We are filling up crates, dismantling machinery and platic-wrapping ourselves dizzy.

The equipment in the background is just one part of the machinery. More to come!

Winter is closing in

It’s getting cold and time to change to winter tires on the car. Looking out the window in the Källström office this morning, seeing how the frost made all the roofs snowy white.

Building = programming

Building a new machine also involves some programming. Our designers Tommy (standing) and Björn are running final tests and tweaking features on a SF4-2D, creative creations in a corner of our busy workshop.

Busy building

Head mechanic “Mirek” is working on one of the latest acid fillers under construction.

The workshop at Källström is busy as always, full of new machines being built. It is almost over-full and we are looking forward to the new workshop that are being planned at the moment. The machine being built is a fully automatic triple-station acid filler of our SF4-2 series.

18th ABC

During the Asian Battery Conference we got a prominent guest in our booth, Suresh Pemmaiah from HP Industries our agent in India.

Källström is setting up

Jim and Bo are working on setting up the Källström booth at Asian Battery Conference in Bali, preparing for the opening for visitors on Thursday and Friday.


Jim in the L8 booth under construction.

Booth L8 at Asian Battery Conference

Tomorrow the 18th Asian Battery Conference starts and we are very happy to participate! Above is a floor plan of the exhibition hall booths at the conference. You will find us, Källström Engineering, in booth L8. Make sure to stop by to say hello and to learn more about our filling and mixing machines and our other equipments and how they can help you in your production.

Week 36 = Källströms at Asian Battery Conference

The coming week (week 36) Jim Sandberg and Bo Johansson from Källström Engineering are on site in Kuala Lumpur in Bali for the 18th Asian Battery Conference at The Westin Resort Nusa Dua September 3–6.

Make sure to visit them in our booth L8 at the exhibition to get to know us at Källström and learn more about what we can do for your business with our custom built systems.

 

 

 

More Lotta!

We are happy to announce that from July 18 Lotta Limborg will be working with us on a more extended basis. Lotta works in logistics, purchase and aftermarket sales and many customers have already met Lotta in her professional role here at Källström. Lotta has been working as a external consultant but from July 18 she is directly employed by Källström Engineering Systems.