The new assembly hall is really full at the moment. One machine is due for shipping and another one is due for assembly start. We are really happy for all the extra work space the new localities are providing. The whole work flow has been improved with assembly, programming, testing and FAT (Factory acceptence Test) and we can work on more machines at the same time which is really an improvement.
Category Archives: Battery Equipment
Shipping out
Yet another shipment is under the way and the fillers are as always properly secured by bolts and straps in the container before sent away from Källströms. Workshop manager Mirek is overlooking the loading to make sure everything is as it should be before departure. Two new SF4-2 on the way to the customer.
New section

Our homepage is step-by-step updated and today a section got extended with a new undersection about options for our battery-filler.
We have collected all options in one place and you can see it here.
In the workshop
We are completing a couple of new machines in the workshop, it’s a couple of our popular SF4-2D. They are up and running and soon ready to be shipped away to customer.
Buildning as usual
We are currently building two new machines of the SF5-41 and are close to completion. Right now it’s isolation of pipes since the machines are built for chilled acid (-16 Celcius).
New week, new shipping
This week we shipped out three machines, two of our popular acid mixers and one sodium mixer.
As always the machines are steadily secured during the shipping, with screws securing the feets and with heavy duty ratchet straps securing the machine to the containers cargo hooks.
Shipping time
In spite of the gray and dull weather, another week another shipping.
This weeks cargo contains three of our popular acid fillers for SLI batteries and one acid level control. The level control unit can be used for checking batteries acid level after top off after formation.

First shipment for 2020
Today we are sending away the first shipping of the new year.
First machine to leave the premises is a sedimentation unit that now is packed, sealed and on it’s way to the customer.
Packages before Christmas
We are working hard now to build and ship hard packages before Christmas. The workshop is filled with machines and it is actually a bit difficult to walk around in the workshop.
One of our SK4 acid control machines is among the equipment soon to be shipped.
We are completing a couple of sodium-mixers (in the background a couple of machines in our SF4-series).
We are also completing a couple of big acid mixing machines right now at our facility.